The project comprises the construction of New Central & Maintenance stores, workshops, and labor facilities, not to mention pre-engineered steel structures along with boatyard building.
With the total BUA of 5,700 m² of pre-engineered steel structures, along with boatyard building. The scope also include shaded parking, shaded boat parking and external works of 18,000 m². In addition to a guard room, substation, pump room and underground water tank.